Serving Portland, Gresham, Vancouver & Surrounding Areas

Asphalt Paving and Driveway Installation in Aloha, OR

New driveways, commercial lots and asphalt repair for Aloha properties, from a crew that works this side of the valley every week.

Portland & Surrounding Areas

Call Now

1 Yr

Warranty

100%

Satisfaction

Local

Portland Team

Serving Aloha, OR

Your Paving Contractor in Aloha, OR

Smooth Rollin’ Sealcoating and Paving works throughout Aloha from our shop in Gresham, and we are on the west side often enough that scheduling here is straightforward rather than an expedition. Aloha runs along the TV Highway corridor about eleven miles west of downtown Portland, and at 53,828 residents it is the largest community in Washington County without its own city hall. We work the residential grid north and south of TV Highway, the strip commercial along the corridor itself, and the newer subdivisions filling in toward Cooper Mountain.

One thing worth knowing before you plan a project here: Aloha is unincorporated. There is no City of Aloha to pull a permit from. Anything that needs one goes through Washington County, and the requirements are not the same as Beaverton’s or Hillsboro’s even though those cities sit on either side of you. We deal with the county regularly and will tell you up front whether your job triggers a permit at all. Most residential driveway replacements on private property do not. Work in the right of way and anything that changes how water leaves your property usually does.

Nearby we also serve Hillsboro, OR, Beaverton, OR, Forest Grove, OR and Cornelius, OR. See every city we cover on our service areas page.

Driveway preparation on a suburban Oregon property

1 Year

Warranty on All Work

Smooth Rollin Sealcoating and Paving work truck
Why Choose Us

The Smooth Rollin' Advantage in Aloha

We deliver exceptional results backed by transparent pricing and a commitment to quality.

We Build for Washington County Rain

The valley floor here holds water. A driveway that drains properly stays intact; one that ponds fails from underneath no matter how good the surface looked on day one. We grade for runoff first and lay asphalt second, and on lots where the fall is wrong we will say so before you spend money on a surface that cannot last.

One Crew From Grading to Final Stripe

Your job is run start to finish by the same team. No subcontractor handoff between the excavation and the paving, no week-long gap where a graded site sits open in the rain. Everything we install in Aloha carries a 1-year warranty on our workmanship.

We Take the Jobs Others Turn Down

Aloha has a lot of 1970s and 1980s subdivisions with tight driveways, awkward slopes and shared access strips. Those are the jobs bigger paving outfits price high to avoid. We take them, and we price them the same way we price a straightforward one.

A Quote You Can Actually Read

You get a written proposal with the scope and the price on it, with the base and drainage work itemized so you can see what you are paying for. If something changes once we open up the site, you hear about it before we do it.

Our Promise

Quality You Can Count On

Every job in Aloha gets the same crew, the same materials and the same walk-through, whether it is a single driveway or a full commercial lot.

Our Services

Complete Asphalt Services in Aloha

We offer a full range of asphalt paving and maintenance services to keep your property safe and looking its best.

Fresh asphalt being laid and compacted on a suburban property

New asphalt driveways and parking areas across Aloha. A driveway starts well below the surface: excavation, a graded and compacted aggregate base, drainage that moves water off rather than holding it, then asphalt laid and rolled at temperature. On Aloha properties the base and the grading do most of the work. Get those right and the driveway lasts; get them wrong and no amount of surface quality saves it. We handle new construction, full replacements where a driveway has failed, and commercial paving for parking areas and private access.

On existing asphalt, sealcoating and crack sealing are what keep water out of the base, and in the Tualatin Valley that is most of the battle. Sealcoat blocks UV, rain and vehicle fluids, and brings the color back. Crack sealing is the higher-value of the two: sealing a crack while it is a quarter inch wide costs a fraction of repairing the pothole it turns into. We will tell you honestly when a Aloha surface is still worth maintaining and when it has gone past that point.

Sealcoating being applied across a suburban asphalt surface
Parking stall lines being painted on a suburban lot

Parking lot layout and restriping for Aloha businesses, including ADA stalls and access aisles to current requirements, fire lanes, crosswalks, numbered stalls and custom stencils. A lot striped to the wrong dimensions is non-compliant no matter how clean the paint looks, so we lay it out properly rather than tracing over whatever was there before. We also install speed bumps, wheel stops, signs and posts.

Potholes, spreading cracks and edges that have started to break up all get worse quickly once water is in the base. We handle crack sealing, patching, saw-cut and full-depth repairs, grinding, and base repair on Aloha driveways and lots. Timely repair is the cheapest work in this trade, and we would rather do a repair now than a replacement in three years.

Asphalt repair work on a suburban property
Our Process

Our Straightforward Process

We make your asphalt project as simple and transparent as possible.

1

Initial Consultation

We discuss what you need and visit your Aloha property to assess the existing surface, check the base and take measurements.

2

Clear Proposal

You receive a detailed, easy-to-understand proposal with straightforward pricing and no hidden fees.

3

Site Preparation

Our team arrives fully equipped to prepare the site, including cleaning, grading, and ensuring proper drainage.

4

Professional Installation

Our crew lays and compacts the asphalt at temperature, using the right equipment for the size of the job.

5

Final Walk-Through

We conduct thorough cleanup and perform a final walk-through to ensure your complete satisfaction.

Testimonials

Client Feedback & Reviews

4.9
Based on 15 reviews
Sean F. profile picture
Sean F.
10 months ago
Cisco and his guy did a great job patching in asphalt for us. He is attentive and hardworking, and the results speak for themselves. We will have them back out once the weather warms back up to seal coat all the asphalt for a much smoother and cleaner look. Can’t wait. If you have any kind of paving needs, do not hesitate to reach out to Cisco, you’ll be happy you did.
Ben C. profile picture
Ben C.
10 months ago
They were quick to show up and bid the job. Once the bid was accepted, they showed up quickly and got the job done. They took their time to do a good thorough prep and cleaned up everything at the end of the job. Very professional and courteous. Highly recommend.
Alejandro J. profile picture
Alejandro J.
12 months ago
Couldn’t be happier. They showed up on last minute notice and far exceeded our expectations with their attention to detail and level of care for our homes driveway. Before, the driveway was a mess, but after Smooth Rollin’ Sealcoating and Paving was done our driveway was more functional and looked incredible. I’ll definitely use for more projects down the road.
Kevin C. profile picture
Kevin C.
12 months ago
Cisco and team did incredible job on my 20 year old driveway. They spent almost 2 days in prep and asphalt repair sealing all the cracks. Final cost looks amazing but really need it to heal up before turning wheels on it. Hard workers in the heat of the day. Highly recommend them!
Rich K. profile picture
Rich K.
1 year ago
Cisco and his crew did a great job on the asphalt patching that I requested. He responded to my Angie’s request almost immediately and was at our home that afternoon to take a look at the work to be done. His bid was lower than that of other contractors that I contacted. Cisco was responsive to text messages and phone calls. I had him do some extensive seal coated after seeing the quality of his work. I’ve worked with many contractors in my nearly fifty years as a homeowner, Cisco is in my top three list. Friendly and easy to work with.
Sabrina H. profile picture
Sabrina H.
1 year ago
Outstanding company. From start to finish Cisco communicated well and did an amazing job . He used plenty of product and worked fast and cleaned up afterwards. I cannot give Smooth Rolling enough stars ⭐️ ⭐️⭐️⭐️⭐️⭐️⭐️⭐️⭐️⭐️⭐️⭐️⭐️⭐️.
I highly recommend them for any paving project .
FAQ

Frequently Asked Questions

Answers to common questions about paving and asphalt work in Aloha.

Aloha is unincorporated, so permits go through Washington County rather than a city. Straightforward replacement of an existing residential driveway on private property often does not need one. Work in the public right of way, new approaches onto a county road, and anything that changes drainage usually does. We will tell you which category your job falls into before you apply.

Four things drive it: square footage, how much excavation and base the site needs, drainage, and truck access. A flat driveway on good ground is the cheap version. A sloped lot on soft ground with a water problem is the expensive one, because most of that cost sits under the asphalt rather than in it. We price after walking the site, because a number given over the phone on this kind of job is a guess.

Paving installs a new asphalt surface. It is the right answer for new construction, or for a driveway or lot whose base has failed and cannot be saved from the top. Sealcoating is preventative maintenance: a protective layer applied over existing asphalt that shields it from UV, rain and vehicle fluids. Paving builds or rebuilds the surface, sealcoating protects one that is still sound. Neither substitutes for the other.

Every two to three years for most Aloha properties, and crack sealing whenever a crack appears rather than on a schedule. Our regional rainfall is the reason the interval is shorter here than in drier parts of the country. Water getting into the base is what ends asphalt, and sealcoat plus crack sealing is what keeps it out. New asphalt is the exception and needs to cure before its first coat.

Normally within about 24 to 72 hours depending on temperature and how thick the section is, and we give you a specific answer for your job before we leave. Full curing takes considerably longer. For the first several weeks avoid parking in the same spot for long periods, turning the wheels of a stationary vehicle, and putting down jack stands or trailer jacks without a board under them.